期刊文献+

Multi-approach analysis of maximum riverbed scour depth above subway tunnel

在线阅读 下载PDF
导出
摘要 When subway tunnels are routed underneath rivers, riverbed scour may expose the structure, with potentially severe consequences. Thus, it is important to identify the maximum scour depth to ensure that the designed buried depth is adequate. There are a range of methods that may be applied to this problem, including the fluvial process analysis method, geological structure analysis method, scour formula method, scour model experiment method, and numerical simulation method. However, the application ranges and forecasting precision of these methods vary considerably. In order to quantitatively analyze the characteristics of the different methods, a subway tunnel passing underneath a river was selected, and the aforementioned five methods were used to forecast the maximum scour depth. The fluvial process analysis method was used to characterize the river regime and evolution trend, which were the baseline for examination of the scour depth of the riverbed. The results obtained from the scour model experiment and the numerical simulation methods are reliable; these two methods are suitable for application to tunnel projects passing underneath rivers. The scour formula method was less accurate than the scour model experiment method; it is suitable for application to lower risk projects such as pipelines. The results of the geological structure analysis had low precision; the method is suitable for use as a secondary method to assist other research methods. To forecast the maximum scour depth of the riverbed above the subway tunnel, a combination of methods is suggested, and the appropriate analysis method should be chosen with respect to the local conditions.
出处 《Water Science and Engineering》 EI CAS 2010年第4期431-442,共12页 水科学与水工程(英文版)
基金 supported by the National Natural Science Foundation of China (Grants No. 50909037,50879019,and 50879020) the Natural Science Foundation of Hohai University (Grant No. 2008426611),the Foundation for Introducing Talents of Hohai University (Grant No. 20080415) the National Science and Technology Pillar Program during the Eleventh Five-Year Plan Period (Grant No. 2008BAB29B08) the Fundamental Research Funds for the Central Universities (Grant No. 2010B01114)
  • 相关文献

参考文献17

  • 1董章增.管道穿河埋深综合判定[J].水利科技与经济,2009,15(8):677-678. 被引量:1
  • 2史英标,鲁海燕,杨元平,曹颖.钱塘江河口过江隧道河段极端洪水冲刷深度的预测[J].水科学进展,2008,19(5):685-692. 被引量:20
  • 3XIE Zuo-tao ZHANG Xiao-feng TAN Guang-ming YANG Fang-li.NUMERICAL SIMULATION OF 2D HORIZONTAL COOLING WATER DISCHARGE IN GENERALIZED CURVILINEAR COORDINATE[J].Journal of Hydrodynamics,2006,18(1):91-96. 被引量:11
  • 4Ataie-Ashtiani,B.,Baratian-Ghorghi,Z.,Beheshti,A. A.Experimental investigation of clear-water local scour of compound piers. Journal of Hydraulic Engineering ASCE . 2010
  • 5Bolduc,L. C.,Gardoni,P.,Briaud,J.Probability of exceedance estimates for scour depth around bridge piers. Journal of Geotechnical and Geoenvironmental Engineering . 2008
  • 6Highway Planning and Design Institute,Ministry of Communications (HPDIMC).Specifications for Survey and Design of Highway Bridge Site. (JTJ 062-91) . 1991
  • 7Huang,J. C.,Wang,Z. Y.,Liu,Z. P.Flow Scour and Pipeline’s Buried. . 1998
  • 8Koustuv,D.,Susanta,C.Bridge pier scour in clay-sand mixed sediments at near-threshold velocity for sand. Journal of Hydraulic Engineering ASCE . 2010
  • 9Lai,J. S.,Chang,W. Y.,Yen,C. L.Maximum local scour depth at bridge piers under unsteady flow. Journal of Hydraulic Engineering ASCE . 2009
  • 10Lu,D.,Cai,C. S.Bridge scour: Prediction,modeling,monitoring,and countermeasures—Review. Practice Periodical on Structural Design and Construction . 2010

二级参考文献17

共引文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部