摘要
论述了下只恩水电站可研和技施设计阶段厂区建筑物的布置,阐述了厂房位置调整及优化设计过程,并详细介绍了技施设计的厂区布置情况。
This paper discussed the design of structures arrangement at Xiazhien hydropower station in feasibility study and construction design.As well,the position selection of powerhouse and optimization were presented.
出处
《大坝与安全》
2010年第5期10-12,共3页
Dam & Safety
关键词
厂房
位置选择
机型
优化
厂区布置
powerhouse
position selection
turbine type
optimization
plant area arrangement