摘要 新铁煤矿将原有9个生产采区缩减到5个,将原来部分采区合并进行联合布置,解放采区隔离煤柱,重新优化设计利用-350米二水平回风大巷兼做一水平-350米以上运输巷,进而减少主运巷压煤,同时解决高吊煤回收,使得原有呆滞煤量得到了合理开发利用,采用先进采煤方法大大提高了矿井回收率。 The new iron mines reduced the original mining area from 9 to 5 and merged and combined arrangement of the original part mine,the liberation of coal pillar mining area,re-optimize the design using the second level of-350 meters of roadway air return cater to a level of-350 meters above the roadway,thereby reducing pressure lane main transport of coal,while addressing the high-hanging coal recovery,making the original amount of sluggish coal get rational development and utilization,the use of advanced mining method greatly improves the recovery of the mine.
作者 韩杰
出处 《价值工程》 2011年第3期261-261,共1页 Value Engineering
关键词 采区 矿井 联合布置 资源回收率 mining area mine joint arrangement resource recovery
  • 相关文献

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部