钻孔灌注桩孔壁稳定性的影响因素研究 被引量:29

Research of Factors Affecting Stabilization of Hole Wall of Bored Pile
原文传递
导出
摘要 以某大型桥梁近接工程为背景,采用专业岩土工程有限元软件Plaxis,对钻孔灌注桩孔壁稳定性的影响因素进行了数值分析研究。研究结果表明:若无邻近老桩基影响,孔径、孔深、泥浆相对密度、护筒深度及成孔时间是钻孔灌注桩孔壁稳定的主要影响因素;在邻近老桩基的影响下,护筒保护和护筒穿越土层的合理深度是可以将两邻近桩基相互影响降到最低的保证。以上研究结果的应用可提高钻孔效率,并可有效控制超近距离建(构)筑物桩基施工的破坏性影响,保证施工安全。 Based on a large bridge approaching construction,the numerical analysis of influencing factors of stabilization of hole wall was performed by using the geotechnical engineering finite element analytical software Plaxis.The research result indicates that(1)without considering the influence of adjacent old pile foundation,aperture,hole depth,specific gravity of slurry,protective barrel depth and hole forming time are key influencing factors which affect the stabilization of hole wall of bored pile;(2)considering the influence of adjacent old pile foundation,protective barrel and the proper depth of protective barrel are assurances which may reduce the interrelationship of new pile foundation and adjacent old pile foundation.The application of this research result can increase efficiency of drilling,effectively control the impact of two extremely close adjacent pile foundations,ensure construction safety.
作者 王中文
出处 《公路交通科技》 CAS CSCD 北大核心 2011年第1期86-90,95,共6页 Journal of Highway and Transportation Research and Development
基金 国家自然科学基金项目(40772170)
关键词 桥梁工程 钻孔灌注桩 桩基 孔壁稳定 近距离施工 影响因素 数值分析 bridge engineering bored pile pile foundation stabilization of hole wall extremely close approaching construction influencing factor numerical analysis
  • 相关文献

参考文献14

  • 1DAVIS A G. The Nondestruetive Impulse Response Test in North America [ J ]. NDT & E International, 2003, 36 (4): 185-193.
  • 2ZHANG L M, TANG W H. Reliability of Bored Pile Foundations Considering Bias in Failure Criteria [ J ]. Geotechnical Journal, 2005, 42 (4) : 1086 - 1093.
  • 3GARG K G. Bored Pile Groups under Vertical Load in Sand[J]. Journal of the Geotechnical Engineering Division, 1979, 105 (8): 939-956.
  • 4LOGANATHAN N, POULOS H G, STEWART D P. Centrifuge Model Testing of Tunneling-induced Ground and Pile Deformations [J]. Geotechnique, 2000, 50 (3) : 283 - 294.
  • 5CHEN L T, POULOS H G, LOGANATHAN N. Pile Responses Caused by Tunneling [ J ]. Journal of Geotechnical and Geoenvironmental Engineering, ASCE, 1999, 125 (3): 207-215.
  • 6LOGANATHAN N, POLOUA H G, XU K J. Ground and Pile-group Responses due to Tunneling [ J]. Soils and Foundations, 2001 , 41 (1) : 57 -67.
  • 7LEE T K, NG W W. Effects of Advancing Open Face Tunneling on an Existing Loaded Pile [ J ]. Journal of Geotechnical and Geoenvironmental Engineering, ASCE, 2005, 131 (2): 193-201.
  • 8孙钧,刘洪洲.交叠隧道盾构法施工土体变形的三维数值模拟[J].同济大学学报(自然科学版),2002,30(4):379-385. 被引量:197
  • 9邵华,张子新.盾构近距离穿越施工对已运营隧道的扰动影响分析[J].岩土力学,2004,25(z2):545-549. 被引量:83
  • 10徐前卫,尤春安,李大勇.盾构近距离穿越已建隧道的施工影响分析[J].岩土力学,2004,25(z1):95-98. 被引量:63

二级参考文献42

  • 1杨俊龙,孙连元,沈成明.盾构机穿越地铁隧道施工技术研究简介[J].现代隧道技术,2004,41(z2):325-329. 被引量:16
  • 2邵华,张子新.盾构近距离穿越施工对已运营隧道的扰动影响分析[J].岩土力学,2004,25(z2):545-549. 被引量:83
  • 3廖少明,余炎,彭芳乐.盾构近距离穿越相邻隧道施工的数值解析[J].岩土力学,2004,25(z2):223-226. 被引量:50
  • 4中国船舶工业勘察设计研究院.上海市明珠线二期工程南浦大桥站工程地质勘察报告[M].上海:中国船舶工业勘察设计研究院,2001..
  • 5孙钧.质构隧道施工的土体扰动及其环境稳定与控制.1999海峡两岸都市公共工程学术暨实务研讨会论文集[M].上海:上海市土木工程学会,1999.314-333.
  • 6易宏伟.盾构施工对土体扰动与土层移动影响的研究[M].上海:同济大学,1999..
  • 7徐方京.软土隧道与深开挖引起土体孔隙水压力与地层移动分析[M].上海:同济大学,1991..
  • 8[1]刘建航,候学渊.软土市政工程施工技术手册--对建筑物影响预测和防止[M].上海: 上海市政工程管理局,1990.
  • 9[2]尹吕超,朱振宏,李玉珍等.日本隧道盾构新技术[M],武汉: 华中理工大学出版社,1999.
  • 10[5]Yamaguchi I, Yamazaki I, and Kiritani Y. Study of ground-tunnel interactions of four shield tunnels driven in close proximity, in relation to design and construction of parallel shield tunnels[J]. Tunnelling and Underground Space technology, 1998, 13:289~304.

共引文献522

同被引文献164

引证文献29

二级引证文献148

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部