摘要
阐述了德兴铜矿二期碎矿控制系统的改造,充分依靠该矿掌握PLC的能力,走出了一条设计、改造的新路。
This article is about the renovation of control system of the phase2 crushing system in Dexing Copper Mine. The renovation completely relys on theplant itself ability in PLC control system, and it creats a new way in design and renova-tion control system.
出处
《有色矿山》
1999年第A03期39-40,共2页
Nonferrous Mines