摘要
本文应用可靠度理论。对二滩拱坝进行可靠度分析,以探索该理论用于拱坝计算的可能性,论证二滩拱坝的安全性和合理性。
By use of reliability theory in the paper the reliabilty analysis is carried out for Ertan Arch Dam to probe the possibility of applying this theory for arch dam calculation and prove the safety and rationality of Ertan Arch Dam.
出处
《水电站设计》
1990年第4期13-24,共12页
Design of Hydroelectric Power Station