有限元方法在某水电站地下厂房顶拱层开挖施工方案比选中的应用 被引量:1

Finite Element Method Using in the Construction Scheme Selection of a Hydropower Station Underground Workshop Arch Excavation
在线阅读 下载PDF
导出
摘要 在地下洞室开挖中,由于岩体中原有结构面的存在,再加上洞室开挖后应力重新分布与集中,以及爆破作业的影响,在洞室顶部一定范围内会形成岩石松散圈。某水电站地下厂房开挖有中导洞先行和两侧导洞先行两种方案,利用有限元方法并参照类似工程,确定了中导洞先行的顶拱层开挖方案。 In the engineering of underground cavern excavation, due to the original structure in rock mass, plus stress redistribute and concentrate after the excavation of cavern, and again, the influence of explosive, thus, the rock loose circle will form inside certain limits of the top cavern. The excavation of a hydropower station underground workshop has two schemes, one is middle drift first and the other one is bilateral drift first. In order to obtain the better method, this thesis utilizes finite element method and refers to the similar engineering, method one has been chosen.
作者 王丹 吴静
出处 《价值工程》 2011年第1期87-88,共2页 Value Engineering
关键词 地下洞室开挖 中导洞先行 有限元 顶拱开挖 underground cavern excavation the excavation of the crown finite element middle drift first
  • 相关文献

参考文献1

  • 1G H Shi. Discontinuous deformation analysis:a new numerical model for the statics and dynamics deformable block structures.Engineering Computations. 1992.9(2).

同被引文献12

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部