摘要
城市化的快速发展促使城市建设中的地铁隧道和基坑工程规模的不断加大,针对城市建筑密集区域存在的基坑开挖对下方地铁隧道产生的环境岩土问题,结合广州地铁珠江新城站区段,参照既有的计算分析的结果,归纳了防止基坑开挖时下方盾构隧道结构变形过大的措施,可供类似工程参考。
Rapid urbanization process brings development of large-sc.,de foundation pit engineering and subway tunnel in the city. In view of some geoenvironmental problems due to negative impact of foundation excavations on adjacent existing subway tunnels below in congested urban district of large cities,a calculation analysis is given combined with the construction work at Zhujiang New Town station section of Guangzhou metro line 5, the inductive measures to prevent the large structural deformation of shield tunnel due to foundation pit excavation were given, which can provide reference to similar engineering.
出处
《地下空间与工程学报》
CSCD
北大核心
2010年第A01期1390-1392,1431,共4页
Chinese Journal of Underground Space and Engineering
基金
国家"十一五"科技支撑计划资助项目--城市地下空间建设工程化技术开发(编号2006BAJ27B05)
关键词
地下空间
环境岩土工程
基坑开挖
地铁保护
underground space
environmental geotechnical engineering
foundation pit excavation
protection of metro