期刊文献+

核电站蒸汽发生器传热管泄漏监测^(16)N传输过程分析 被引量:3

^(16)N Transmission Analysis for Steam Generator Tube Leak Monitoring in Nuclear Plant
在线阅读 下载PDF
导出
摘要 氮-16监测系统中,确定16N传输时间是一项关键技术,目前仅限于用理论方法求解.以55/19型蒸汽发生器为例,通过对其结构以及热工水力特性的分析,研究了蒸汽发生器传热管泄漏后一回路中16N核素进入二回路后的传输过程,并简要给出了求解方法,可作为求解蒸汽发生器传热管泄漏监测16N传输时间的基础. In 16N monitoring system,the determination of 16N transit time is a key technology,which is currently limited to using theory calculation.This article takes 55/19 steam generator as an example to study the transmission of the 16N from the primary circuit to the secondary circuit after steam generator tube leaking by analysis of the structure and the thermo-hydraulic characteristics of the SG,and give a calculation method briefly,which can be used as the basis for calculating the transit time of 16N for steam generator tube leak.
作者 李闰生 凌球
出处 《南华大学学报(自然科学版)》 2010年第3期6-9,共4页 Journal of University of South China:Science and Technology
关键词 蒸汽发生器 16N 传输过程 Steam generator 16N transmission
  • 相关文献

参考文献2

二级参考文献3

  • 1徐济鋆.饱和汽轮机测技术:主蒸汽管放射性在线监测系统[M].上海交通大学核科学与系统工程系,2001..
  • 2李德平.辐射防护手册第二分册辐射监测技术[M].北京:原子能出版社,1987..
  • 3Grosswendt B, et al. Monte-Carlo calculation of the intrinsic gamma ray efficiencies of cylindrical NaI(Tl) detectors[J]. Nucl Instrum Methods,1976,133:25.

共引文献11

同被引文献15

引证文献3

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部