通过对汪家寨煤矸石电厂2×300MW新建工程可研阶段烟囱防腐方案的探讨,主要讨论按湿法脱硫无GGH工艺的烟囱设计,对工艺流程和国内外工程实例的分析比较给出烟囱的结构和防腐的建议方案。
This article discusses Wangjiazhai power plant 2× 300MW new project feasibility stage chimney anticorrosion solution and the chimney design of the wet desulfurization process without GGH chimney. Through the analysis and comparison about the process of engineering and examples of factory both at home and abroad, the author provided the structure and anti - corrosion proposal of chimney.
出处
《贵州电力技术》
2010年第11期63-65,共3页
Guizhou Electric Power Technology
关键词
烟囱
湿法脱硫工艺
防腐内衬材料
chimney, wet desulfurization process, anticorrosion lining materials