摘要
锦屏一级水电站上游土石围堰堰基采用塑性混凝土与墙下帷幕防渗,以适应松散透水地基复杂的水文地质条件和工程地质条件。该围堰塑性混凝土原材料选择、配合比设计、生产工艺、浇筑施工和质量控制等方面的经验,可供相关工程参考。经检查,该围堰塑性混凝土质量达到优秀水平。
The upper earth-rock cofferdam of Jinping I Hydropower Station use plastic concrete and curtain wall for seepage control.The quality of plastic concrete construction is excellent after taking measures on raw material selection,mix design,production process,pouring and quality control.The experiences can be as references for similar construction.
出处
《水力发电》
北大核心
2010年第2期65-67,共3页
Water Power
关键词
围堰
防渗墙
塑性混凝土
锦屏一级水电站
cofferdam
cut-off wall
plastic concrete
Jinping I Hydropower Station