清水混凝土的最终表现效果60%取决于混凝土的浇筑质量,40%取决于混凝土后期的保护。从模板设计安装、混凝土浇筑和成品保护等方面介绍了拉西瓦水电站地下厂房工程清水混凝土施工的技术措施及经验体会。
The contribution of concrete placement quality and the following protection to the quality of fair-faced concrete is about sixty percent and forty percent respectively.The technologies and experiences for fair-faced concrete construction of underground powerhouse of Laxiwa Project is introduced herein from the formwork design and installation,concrete placement and the protection of finished conrete.