摘要
积石峡水电站厂房工程在压力钢管平段、肘管、蜗壳底部,钢筋密集的机墩、薄壁风罩墙、排架柱牛腿等部位使用高流态自密实混凝土施工,施工质量和施工进度都得到了保证,为水电站高流态自密实混凝土施工积累了经验。
In the construction of horizontal segment of pressure pipe,elbow pipe and the bottom of scroll case,and the unit pier,thin air cover wall,corbel of bent column and others with intensive steel frame in Jishixia hydropower Station,the selfcompacting guss concrete is used.The results show that the construction quality and schedule have been guaranteed and the experiences of construction can be as reference for future self-compacting guss concrete construction.
出处
《水力发电》
北大核心
2010年第2期36-37,40,共3页
Water Power
关键词
高流态混凝土
施工
积石峡水电站
guss concrete
construction
Jishixia Hydropower Station