摘要
对武钢四炼钢10万m3转炉煤气柜在设计、施工和调试等过程中出现的问题分析原因并进行改进,实现转炉煤气柜如期投产和安全运行。
The problems in design,construction and commissioning of 100000 m3 converter gas holder of No.4 Steelworks of Wuhan Iron and Steel(Group) Corp.were analyzed and improving measures were given.The gas holder went into operation on schedule and ran smoothly.
出处
《冶金动力》
2010年第6期48-50,共3页
Metallurgical Power
关键词
转炉煤气柜
皮膜
联锁
密封
converter gas holder
involucre
interlock
sealing