以磨憨光明采选厂干尾矿渣库为例,对尾矿库防洪能力可靠性进行分析,通过计算尾矿库洪峰流量、洪水总量并进行调洪验算以确定该尾矿库的防洪能力。计算结果表明,该尾矿库满足防洪要求。
Taking the dry tailing pond of Mohan Guangming Mining Plant for example, reliability of flood control capacity of the tailing pond was analyzed in the paper. Through calculating peak discharge and flood volume and checking flood regulating, flood control capacity of the tailing pond was determined. The calculation results showed that the tailing pond meets flood control requirements.
出处
《工矿自动化》
2010年第11期44-46,共3页
Journal Of Mine Automation
关键词
尾矿库
防洪能力
可靠性分析
洪峰流量
调洪演算
tailing pond, flood control capacity, reliability analysis, peak discharge, flood regulating calculus