期刊文献+

塔里木沙漠公路沿线机械防沙体系效益分析 被引量:85

The Benefit of the Preve ntion System along the Desert Highway in Tarim Basin
在线阅读 下载PDF
导出
摘要 野外实测和室内风洞实验的数据分析表明,塔里木沙漠公路沿线高立式沙障和半隐蔽式沙障发挥了较大的防沙效益,平沙地上高立式沙障的防护距离在18H左右。3种高立式沙障防沙效益各不相同,以芦苇栅栏最佳,抗紫外线尼龙网栏次之,白尼龙网栏最差。随设置路段、地貌部位、风沙活动强度不同,各种高立式沙障使用年限有差异。沙漠腹地半隐蔽式沙障的掩埋速度为2.0~14.4m·a-1左右。 The paper, based on the data obtained from the survey in field and wind tunnel e xperiments, shows that the prevention system along the desert highway in Tarim B asin is playing with obvious benefits. The grain size analysis shows that on fl oat sand landform the shelter distance of upright sand fence is at about 18 H . Inside the semi covered fences the changes of grain size are evident, more fine sands are concentrated, and with the lapse of time, clay will be formed ins ide the semi covered fences. Wind tunnel experiments and the results of field o bservation show that the benefits of the three types high fences are different. Among them the reed fence is optimum, which followed by anti ultraviolet nylo n fence and white nylon fence in order. However, with the sand deposition, the whit e nylon fence's benefit of prevention will be higher than anti ultraviolet nylo n fence. Based on the data obtained in field, it is estimated that the usable du ration of reed fence is 2 ̄6 years, that of white nylon fence is 1 ̄5 years and t hat of anti ultraviolet nylon fence is 1 ̄4 years, they are different with the l ocations of fences. The width of the semi covered fences covered by sands is primarily decided by the times of gale and its duration. Furthermore, the speed of the prevention system being covered and the quantities of sand deposition ar e not only extremely related with the stress of the wind sand activities, but a lso with the angle ( α ) of the direction of the major sand drifting wind wi th the desert highway and the landforms that the highway acrossed. For example, the being covered speeds of the prevention systems on dunes concentrated landfo rms ( α <10°) and the float landforms ( α >60°) are different evidently; the lat ter is more quickly and is more likely to cause sand disaster to the desert highway. In Tazhong area, the being covered speed of semi covered fences is abo ut 2 0 ̄14 4 m\5a -1 , however, with the lapse of time, it will be accelera ted.
出处 《中国沙漠》 CSCD 北大核心 1999年第2期120-127,共8页 Journal of Desert Research
基金 国家"八五"重点科技攻关项目
关键词 沙漠公路 高立式 沙障 效益 机械防沙体系 公路 Desert highway\ Upright sand fence\ Semi covered s and fence\ Benefit
  • 相关文献

参考文献7

二级参考文献11

  • 1陈渭南,董治宝,杨佐涛,韩致文,张甲坤,张民力.塔克拉玛干沙漠的起沙风速[J].地理学报,1995,50(4):360-367. 被引量:106
  • 2吴正,风沙地貌学,1987年
  • 3钱宁,泥沙运动力学,1983年
  • 4吴正,力学与实践,1981年,3卷,1期,8页
  • 5朱震达,塔克拉玛干风沙地貌研究,1981年
  • 6Hsu Shinang,J Geographyscial Research,1976年,76卷,36期,8684页
  • 7韩致文,中国沙漠,1993年,14卷,1期,31页
  • 8夏训诚,中国沙漠,1992年,15卷,1期,1页
  • 9冯连昌,第二届全国风工程及空气动力学学术会议论文集,1986年
  • 10徐峻岭,中国沙漠,1982年,3卷,2期,16页

共引文献77

同被引文献989

引证文献85

二级引证文献1110

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部