摘要
根据对地下连续墙的认识,结合上海地铁二号线石门一路站地下连续墙施工情况,对施工中的一些技术问题进行了探讨,供同类工程参考。
Based on the knowlege of Underground successive wall and the Construction of the underground successive wall in the 1 station of shimen of the 2 line of Shanghai subway, this paper discusses some technologic problems in the construction, which can be referenced in the other constructions of this sector.
出处
《西部探矿工程》
CAS
1999年第3期15-17,共3页
West-China Exploration Engineering
关键词
软土地层
地下连续墙
施工技术
Soft formation underground successive wall construction lechnology.