摘要
简要介绍了二滩水电站两条泄洪隧洞的布置、选型、结构设计,以及在高流速水流条件下所采取的减免蚀措施和防雾化措施。
The layout,type selection and structure design of two spillway tunnels,as well as the reducting erosion measure and anti atomizing measure applied under high velocity water flow condition are briefly introduced.
出处
《水电站设计》
1999年第2期42-46,66,共6页
Design of Hydroelectric Power Station
关键词
泄洪洞
隧洞设计
二滩水电站
水电站
spillway tunnel
structure calculation,aerating facilities
Ertan Hydroelectril Plant