摘要
对某康复中心深基坑喷锚网支护工程中的锚杆的抗拔试验装置、加载和试验结果及锚杆的应变观测进行了详细的介绍,简要地分析了试验结论,可供同类型支护工程参考。
Combined bolting and shotcrete method is applied to the deep excavation of a rehabilitation centre. The experimental method is described in detail, and the experimental conclusion is also analysed briefly, which can be referred by the same type of project.
出处
《建筑结构》
CSCD
北大核心
1999年第5期18-19,共2页
Building Structure
关键词
深基坑
喷锚网支护
试验
deep excavation
combined bolting and shotcrete
experiment