黑石沟特大桥0号块支架施工技术 被引量:1

The No.0 blocking support construction technology of the super large bridge on the blackstone gap
在线阅读 下载PDF
导出
摘要 结合黑石沟特大桥特点,着重论述了0号块施工支架的设计施工和顶板反吊支架的设计施工,指出所采用的方法具有取材方便、组装快速、变形小、经济适用等优点,非常适合高墩施工和无基础支撑条件的墩柱施工,为类似工程积累了宝贵经验。 Combined with the characteristics of the super large bridge on the blackstone gap, it focuses on discussing the design construction of the No. 0 blocking construction support and the roof deck-type bearing frame. Pointed out adopting this method to be sampling convenient, as- sembling rapid, little deformation, economical and practical advantages. It is very suitable for the high pier column construction and the pier column of ungrounded support condition. To accumulate the valuable experience for the similar projects.
出处 《山西建筑》 2010年第33期331-334,共4页 Shanxi Architecture
关键词 预应力支架 反吊支架 施工技术 pre-stressed supporting frame, deck-type bearing frame, construction technology
  • 相关文献

参考文献5

二级参考文献13

共引文献1763

同被引文献22

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部