缓倾斜薄矿脉分条推进连续出矿高效采矿工艺 被引量:16

High-efficient Mining Technology of Continuous Ore-drawing with Sub-section Advancing for Flat-dipping Thin Ore-bodies
在线阅读 下载PDF
导出
摘要 缓倾斜极薄矿脉的开采存在的共同难题是矿山生产能力低,回采难度大。某矿通过采用斜井开拓,胶带提升,中段胶带运输连续出矿,分条推进回采工艺,不留或少留矿石矿柱,实行连续回采,控制采幅,最大限度地提高矿石回收率,减少贫化,有效地解决了开采和运输难题,为薄矿体的高效开采提供了一个新思路,其研究结果对缓倾斜薄矿脉的高效开采具有重要意义。 The common problems existing in the exploitation of flat-dipping thin ore-bodies are that the production capacity is lower and the recovery is difficult.Through developing the inclined well and adopting belt hoisting,continuous ore-drawing at medium belt transport,and sub-section advancing mining process,no or less pillar remained,the continuous recovery can be realized.The working width should be controlled to maximize the ore recovery and reduce the dilution so as to effectively solve the problems in mining and transportation.This method can provide a new idea for the efficient exploitation of thin ore-body,and the research results play an important role in high efficient mining of thin mineral veins.
作者 芦世俊
出处 《金属矿山》 CAS 北大核心 2010年第10期17-19,23,共4页 Metal Mine
关键词 缓倾斜 薄矿脉 分条推进 连续出矿 Gentle inclination Thin mineral veins Sub-section advancing Continuous ore-drawing
  • 相关文献

参考文献4

  • 1Blackfriars Court Investment Holdings Limited.Mining Geotechnical Feasibility Study of Buffelsfontein Chrome Mine Roport No.303129/Geotech[R][S.l]:Blackfriars Court Investment Holdings Limited,2003.
  • 2《采矿设计手册》编写组.采矿设计手册[M].北京:中国建筑工业出版社,1986.
  • 3兰州有色冶金设计研究院.酒钢集团公司南非铬铁工程可行性研究报告[R].兰州:兰州有色冶金设计研究院,2003.
  • 4Blackfriars Cout Investment Holdings Limited.Buffelsfontein Chrome Mine Mining Feasibility Study report 303129/Mining[R][S.l.]:Blackfriars Court Investment Holdings Limited,2003.

同被引文献98

引证文献16

二级引证文献80

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部