期刊文献+

引水隧洞复杂地质段地质超前预报综合评价 被引量:5

Geological Prediction Evaluation of the Complex Geological Section of Diversion Tunnel
在线阅读 下载PDF
导出
摘要 由于单一地质超前预报方法对复杂地质段预报的局限性,本文则主要通过地质编录法、瞬变电磁法、水平声波反射法三种方法的综合分析,避开各种方法局限性的影响,完成对复杂地质段的超前预报,同时成功预报一个次生断层以及该断层影响带宽度,并给施工提供合理建议,使得施工顺利进行。预报结果与实际开挖地质情况基本一致,取得了显著效果。因此,在面对复杂地质段时,应用地质编录法、瞬变电磁法、水平声波反射法综合评价地质情况,获取准确、可靠的地质超前预报结果,是一种高效、可行的组合方法之一。 This paper analyzes the three methods of geological record,time domain electromagnetic methods(TEM) and Horizontal Sound Probing(HSP) to avoid the limitations from the methods so as to complete the complex geological predication and meanwhile predicts the secondary fault and the width influenced by the fault.This paper also provides some reasonable suggestions for the construction,so the work goes on very well.Therefore,it is efficient and acceptable to adopt the methods of the geological record,TEM and HSP in the condition of complex geological section.
出处 《工程地球物理学报》 2010年第5期630-633,共4页 Chinese Journal of Engineering Geophysics
关键词 地质超前预报 TBM HSP 瞬变电磁法 geologic prediction tunnel boring machine horizontal sound probing time domain electromagnetic methods
  • 相关文献

参考文献7

二级参考文献17

  • 1薛国强.论瞬变电磁测深法的探测深度[J].石油地球物理勘探,2004,39(5):575-578. 被引量:93
  • 2[1]张裕恒、李玉芝.超导物理.合肥:中国科学技术大学出版社,1991.
  • 3[2]朴化荣.电磁测深法原理.北京:地质出版社,1991.
  • 4[6]J B Lee, D L Dart, et al. Airborne TEM surveying with a SQUID magnetometer sensor, Geophysics,2002, 67(2): 468~477.
  • 5[7]G Panaitov, M Bick, et al. Peculiarities of SQUID magnetometer application in TEM. Geophysics,2002, 67(3): 739~745.
  • 6[6]山西省地球物理地球化学勘查院.山西省清徐县麦地掌煤矿工业广场陷落柱物探勘察报告[R].山西省地球物理地球化学勘查院,2006.
  • 7何发亮 李苍松.物探方法在隧道施工期地质超前预报中的应用[C]..《中国工程地球物理检测技术》论文集[C].,2001年.145-149.
  • 8陕西省引红济石调水工程地质勘察报告[R].西安:陕西省水利电力勘测设计研究院,2007.
  • 9陕西省引红济石调水工程初步设计报告[R].西安:陕西省水利电力勘测设计研究院,2007.
  • 10引红济石调水工程Ⅰ、Ⅲ标施工期安全监测(阶段报告1-5期)[R].西安:西安理工大学岩土工程研究所,2007.

共引文献20

同被引文献92

引证文献5

二级引证文献60

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部