台阶法施工中下台阶开挖对预留变形量的影响 被引量:27

Effects of Excavation of Lower Bench on the Reserved Deformation in the Bench Method
原文传递
导出
摘要 隧道施工中,预留变形量的合理确定能较准确的预计开挖轮廓,既可确保围岩充分变形而减小围岩压力,又可避免侵限的情况发生,对于隧道的设计和施工有重要影响。本文对台阶法施工下隧道的预留变形量的主要影响因素进行了分析和探讨,并通过现场实测与数值模拟相结合,结果表明,台阶法开挖中下台阶开挖引起的变形是围岩总变形的重要组成部分,可以达到总变形量的50%左右。确定预留变形量时必须充分重视下台阶开挖引起的变形。此工作可为今后类似的工程的实施提供一定的借鉴与参考。 When tunnel is under construction,the excavation outline of the tunnel can be predicted exactly by the rational account of reserved deformation,which is also benefit to tunnel surrounding rock deformation and decrease of its stress.In this paper,the major influential factors of reserved deformation are discussed when tunnel is built with the bench method.According to the association method of in-situ measurement and numerical simulation,the rational account of reserved deformation is suggested,when tunnel is built with the bench method.The results show that the deformation caused by excavation of the lower bench is an important component of the total deformation in the surrounding rock,and can reach 50% of the total.For the reserved deformation,full attention must be paid to the deformation caused by excavation of the lower bench.The work presented here can be referred in similar projects.
作者 王鹏
出处 《地下空间与工程学报》 CSCD 北大核心 2010年第5期1077-1081,共5页 Chinese Journal of Underground Space and Engineering
关键词 预留变形量 台阶法 下台阶开挖 rational deformation bench method lower bench excavation
  • 相关文献

参考文献11

二级参考文献27

共引文献294

同被引文献172

引证文献27

二级引证文献143

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部