摘要
以大、中型池型试范快堆为例,介绍有关快堆启堆的两个主要试验阶段的经验:(1)装料前预备工作、充钠、堆整体试验;(2)装料、逼近临界及提升功率试验。
This paper is mainly concerned with the experiences of the two main phases of startup operational tests of fast reactors:(1) The general tests and Sodium filling before core loading.(2) The core loading,approach to criticality and power build up operational tests,taking for example a large and middle demonstrating integrated-type fast reactor.
出处
《核科学与工程》
CSCD
北大核心
2010年第2期97-109,共13页
Nuclear Science and Engineering
关键词
快中子堆
启堆
装料
逼近临界
提升功率
fast reactor
startup operation
fuel loading
approach to criticality
rising of power operation