摘要
结合相关行业规范和实际工程的计算经验,对目前常用的公路隧道明洞结构荷载计算方法进行了系统的介绍和总结,针对作用于明洞结构上的不同荷载分别阐述了水土合算与分算的选用原则及其他主要荷载的计算方法,以期指导公路工程设计。
Combining with the calculation experience for the relative guild regulation and the factual project, the paper introduces and sums up the common calculation methods for the open-cut structure of road tunnels, and illustrates the selection principle for the water-soil joint calcula- tion and water-soil separate calculation and other calculation methods for the loading capacity, so as to direct the design of the road projects.
出处
《山西建筑》
2010年第31期318-319,共2页
Shanxi Architecture
关键词
公路隧道
明洞
荷载
计算方法
road tunnel, open-cut tunnel, loading capacity, calculation method