期刊文献+

一种独立制造岛作业计划的编制方法 被引量:1

A Way of Scheduling Autonomous Manufacturing Island Scheme
在线阅读 下载PDF
导出
摘要 本文分析、讨论了CIMS环境下,采用独立制造岛生产模式的车间作业计划的调度规则和编制问题在此基础上。 In this paper the control roles and scheduling way of Autonomous Manufacturing Island scheme are analyzed and discussed with the CIMS. Based on this, a way is performed to schedule Autonomous Manufacturing Island scheme.
出处 《天津理工学院学报》 1999年第2期54-56,共3页 Journal of Tianjin Institute of Technology
基金 天津市21世纪--青年科学基金
关键词 CIMS 独立制造岛 车间作业计划 CIMS Autonomous Manufacturing Island Job Shop Scheduling
  • 相关文献

参考文献7

二级参考文献9

共引文献24

同被引文献11

  • 1Tu Y L. Real-time scheduling and control of one-of-a-kind production [J]. Production Planning b- Control, 1997, 8(7):701-710.
  • 2Kuhlmann T H. A revolving planning and control system [C]//Proceedings of New Approaches Towards One-of-a- kind Production,Bremen, Germany, 1991: 95-112.
  • 3Hirsch B E, Kuhlmann T H. Harmonization of decentral- ized, autonomous production areas [C]//Proceedings of IF- AS CIM in Process and Manufacturing Industries, Espoo, Finland, 1992: 69-74.
  • 4Chiang T C, Fu L C. Using dispatching rules for job shop scheduling with due date-based objectives [C]//Proceedings of the 2006 IEEE International Conference on Robotics and Automation,Orlando, Florida, 2006: 1426"-1431.
  • 5Dominic P D D, Kaliyamoorthy S, Kumar M S. Efficient dispatching rules for dynamic job shop scheduling [J]. In- ternational Journal of Advanced Manufacturing Technolo- gy., 2004, 24(1/2) :70-75.
  • 6Chiang T C, Fu L C. Solving the FMS scheduling problem by critical ratio-based heuristics and the genetic algorithm [C]//Proceeding of the 2004 IEEE Conference on Robotics and Automation, Vol 3, New Orleans, LA, USA, April 26-May 1, 2004: 3131-3136.
  • 7Reeja M K, Rajendran C. Dispatching rules for scheduling in assembly jobshops, part 1 [J]. International Journal of Production Research, 2000, 38(9):2051-2066.
  • 8Mohanasundaram K M, Natarajan K, Viswanathkumar G, et al. Scheduling rules for dynamic shops that manu facture multi-level jobs [J]. Computers and Industrial Engineering, 2002, 44(1): 119-131.
  • 9Choi B K, You N K. Dispatching rules for dynamic sched- uling of one-of-a-kind production [J]. International Jour- nal of Computer Integrated Manufacturing, 2006, 19(4) : 383-392.
  • 10Hicks C, Song D P, Earl C F. Product due date assign- ment for complex assemblies [J]. International Journal of Production Economics, 2002, 76(3): 243-256.

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部