河南南阳回龙抽水蓄能电站上库渗漏计算水文地质参数的验证

Validation of Hydro-geological Parameters for Upper Reservoir Seepage Calculation of Huilong Pumped Storage Power Station in Henan Province
在线阅读 下载PDF
导出
摘要 上库特殊的地形、地质条件决定了上库渗漏的严重性,水文地质参数是影响渗漏计算成果的关键因素,勘察设计阶段采用工程类比确定的计算参数可能存在较大误差。工程施工后,根据同一构造带在洞内的渗水情况,选择合理边界条件和概化模型可以反算构造带的渗透系数,反算后的结果表明,原渗漏计算采用的渗透系数是合理的,研究成果为防渗方案的最终确定提供了可靠的依据。 The special terrain and geological conditions of upper reservoir have resulted in serious leakage of upper reservoir.The hydro-geological parameters are key factors for seepage calculation,while there is a biggish error in calculation parameters confirmed by project comparison method during investigation and design phase.The hydraulic conductivity of tectonic zone has been back calculated through selecting reasonable boundary condition and generalized models after construction,according to the seepage situation in cavity of the same tectonic zone.The results show the hydraulic conductivity adopted in formerly seepage calculation is reasonable.The results have provided credible references for determining the seepage control scheme ultimately.
出处 《资源环境与工程》 2010年第5期493-495,共3页 Resources Environment & Engineering
关键词 水文地质 等效渗透系数 边界条件 概化模型 hydro-geology equivalent hydraulic conductivity boundary condition generalized models
  • 相关文献

参考文献2

二级参考文献1

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部