摘要
超前地质预报作为隧道工程施工过程中规避施工风险的一项重要保证手段,已被广泛运用。结合石桥头隧道的超前地质预报工作实施情况,分析了地质预报在石桥头隧道中的应用成果,起到了完善设计,优化施工方法的作用,为隧道的安全施工提供了有力的信息支持。
Advance geological forecast,as an important guarantee means to avoid construction risk in the tunnel construction process,has been widely used. Combined with the implementation situation of advance geological forecast work of stone bridge head tunnel,this paper analyzes the application results of the geologic forecast in the stone bridge head tunnel,which played the role of perfecting design,optimizing construction method and provide a powerful information support for the the tunnel construction safety.
出处
《价值工程》
2010年第31期117-118,共2页
Value Engineering
关键词
隧道
浅埋
超前地质预报
tunnel
shallow buried
advance geological forecast