摘要
垃圾填埋场在运行过程中会产生大量的渗沥液,如果处理不当将会引起地表水、地下水和土壤等严重的二次污染。通过高安屯卫生填埋场的实际运行情况,系统介绍该场的渗沥液处理工艺和处理效果,指出了生化加膜法实际运行中存在的问题,并提出了相关建议。
Large amount of leachate would be produced during operation landfill of sites,and it needed to be treated properly,otherwise it would lead to severe secondary pollution of surface water,ground water and soil.Combining the performance of Gaoantun Sanitary Landfill Site,the paper introduced systematically the leachate treatment process and its effect,pointed out the problems of MBR-UF /NF /RO process during its operation,and proposed some suggestions finally.
出处
《环境工程》
CAS
CSCD
北大核心
2010年第5期43-46,共4页
Environmental Engineering
关键词
卫生填埋场
渗沥液
处理工艺
生化加膜法
sanitary landfill site
leachate
treatment process
MBR-UF /NF /RO