大跨悬索桥主缆系统施工控制计算方法研究 被引量:4

Research on Calculation Method of Main Cable System Construction Control of Long Span Suspension Bridge
原文传递
导出
摘要 悬索桥的施工控制不同于其他桥梁结构形式,主缆一经架设完成很难进行后期线形调整,精确计算主缆系统的施工控制参数尤为关键。针对已有计算方法存在的不足之处,基于悬索桥在恒载作用下的力学特点,提出一种主缆施工控制计算的解析迭代法,该法根据受力平衡条件和变形相容条件建立迭代方程,自动计入了柔索结构的所有非线性,可精确计算恒载状态下成桥线形、主缆无应力长度、空缆线形、主索鞍预偏移量等。四渡河大桥的实例应用表明该法具有较高精度。 It is more important to calculate accurately the construction control parameters of main cables for suspension bridge, because the line-type of main cables cannot be adjusted once they are erected,unlike other bridge style. In view of drawbacks of the existed methods, a method of analytical iteration is presented for construction control calculation of main cable based on the mechanical feature of the bridge under dead load. The iterative equation is established based on the condition of force equilibrium and the condition of deformation compatibility, and taking the non-linearity of the flexible cable structure into con- sideration. The line-type of construction state under dead load, unstressed length of suspender, line-type of the suspender and presetting offset of main suspender saddle can be calculated accurately. It shows that the method is more precise by applications in Sidu River Bridge.
出处 《公路》 北大核心 2010年第10期1-5,共5页 Highway
关键词 悬索桥 主缆 解析法 施工控制 无应力长度 suspension bridge analysis construction control calculation main cable unstressed length
  • 相关文献

参考文献4

二级参考文献13

  • 1杨进,黄铁生.汕头海湾悬索桥主缆设计[J].桥梁建设,1993,23(2):2-9. 被引量:12
  • 2沈锐利.悬索桥主缆系统设计及架设计算方法研究[J].土木工程学报,1996,29(2):3-9. 被引量:183
  • 3潘永仁.悬索桥的几何非线性静力分析及工程控制(博士论文)[M].上海:同济大学,1996..
  • 4肖汝诚,悬索桥结构专用程序系统使用说明书,1996年
  • 5肖汝诚,博士学位论文,1996年
  • 6肖汝诚,华东公路,94期,13页
  • 7肖汝诚,华东公路,68期,54页
  • 8肖汝诚,计算力学学报,10卷,1期,92页
  • 9潘永仁,博士学位论文,1996年
  • 10杨进,桥梁建设,1993年,2卷,2页

共引文献141

同被引文献35

引证文献4

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部