期刊文献+

面向机加与装配混合生产系统的建模与仿真技术 被引量:9

Modeling and Simulation Technology Oriented to Machining-assembly Combined Production System
在线阅读 下载PDF
导出
摘要 针对传统面向机加或装配建模与仿真割裂了两者之间协作关联生产的问题,研究精益生产模式下综合机加与装配的混合生产系统建模与仿真技术。引入齐套工位的概念,建立统一的工艺描述数据结构,解决机加与装配生产衔接的关联定义问题;以车间—工位—设备的层次化结构及其关联关系为基础,构建车间层、工序/工位/齐套层和设备层,以及面向组合生产的批处理逻辑控制器,定义控制器之间的协作接口关系,建立模块化的建模元件库;采用物理模型和控制器模型分离的策略,通过实际车间布局元素与控制器之间的映射关联,实现工艺和布局数据驱动的生产系统自动建模;采用将生产系统的运行映射为控制器之间交互协作的方法,提出任务数据驱动的层次化和模块化的仿真运行控制机制,实现基于设备、队列以及生产对象仿真运行事件的统计分析,为基于仿真的优化决策提供了支持。结合某研究所的混合生产系统,通过生产任务投产时间安排的对比统计分析案例表明,该技术能够有效支持数据驱动的机加与装配混合生产系统的快速、柔性建模与仿真,为精益生产提供了决策分析手段。 In view of the problem of collaborative production relationship between machining or assembly isolated by the separately modeling and simulation for each production system,the modeling and simulation technology oriented to machine-assembly combined production system,which supports the JIT (just-in-time) production pattern,is put forward.By importing the concept of the integrity assembly work station,the unified process description data structure for the combined production system is proposed and the collaborative production relationship between the machining and assembly is defined.Based on the hierarchical and interaction architecture of the workshop-work station-equipment,the modular modeling library embodied as the logic controller,corresponding with each level of the architecture,is constructed,and the lot-sizing process logic controller is also derived in order to reflect practice of the portfolio production.By utilizing the separation strategy between the physical model and control blocks,the layout and process data-driven rapid modeling methodology is brought forward on the basis of the mapping between the layout element and logic controllers.The task data-driven,hierarchical and modular simulation control mechanism is presented under the guidance of mapping methodology between the practical operation of the production system and the collaborating interaction among logic controller.The statistics of the equipment,queue and product driven by the simulation event is gathered and can support the optimization decision based on simulation.The optimization planning case of the task's production release time based on comparative analysis with such practical combined production system in a research institution shows that data-driven modeling and simulation technology can effectively be used for lean production decision.
出处 《机械工程学报》 EI CAS CSCD 北大核心 2010年第19期155-164,共10页 Journal of Mechanical Engineering
基金 国防基础研究资助项目(B0820060396)
关键词 精益生产 混合生产系统 齐套工位 数据驱动建模 逻辑控制器 层次化仿真 Lean production Combined production system Integrity assembly work station Data-driven modeling Logic controller Hierarchical simulation
  • 相关文献

参考文献14

  • 1ANGLANI A, GRIECO A, PACELLA M, et al. Object-oriented modeling and simulation of flexible manufacturing systems: A rule-based procedure[J]. Simulation Modelling Practice and Theory, 2002, 10(3-4): 209-234.
  • 2宁汝新,刘检华,唐承统.数字化制造中的建模和仿真技术[J].机械工程学报,2006,42(7):132-137. 被引量:52
  • 3王国新,宁汝新,王爱民.面向可重构制造单元的仿真建模技术研究[J].系统仿真学报,2007,19(17):3894-3898. 被引量:14
  • 4TRUONG H T, VORATAS K. A simulation approach for performance evaluation of pull-push systems[C]// Proceedings of the 2005 International Conference on Simulation and Modeling, Janurary 17-19, 2005, The Rose Garden Aprime Resort, Bangkok, Thailand. Bangkok: Asian Institute of Technology, 2005: 1-8.
  • 5TSINARAKIS G J , TSOURVELOUDISN C , VALAVANIS K P. Studying multi-assembly machine production systems with hybrid timed Petri-nets[C]// Proceedings of the 2005 IEEE International Conference on Automation Science and Engineering, August 1-2, 2005, Edmonton, Canada. Piscataway, N J: IEEE Service Center, 2005: 1-6.
  • 6JUHANI H, JARI M. Modeling and simulation for customer driven manufacturing system design and operations planning[C]//Proceedings of the 2007 Winter Simulation Conference, December 9-12, 2007, Washington D.C. USA: Winter Simulation Conference, 2007: 1-10.
  • 7VENKATESWARAN J, SON Y J. Hybrid system dynamic-discrete event simulation-based architecture for hierarchical production planning[J]. International Journal ofProductionResearch, 2005, 43(20): 4397-4429.
  • 8JEONG K Y, ALLAN D. Integrated system design, analysis and database-driven simulation model generation [C]// Proceedings of the 37th Annual Simulation Symposium, April 18-22, 2004, Arlington, VA, USA. Washington, DC:IEEE Computer Society, 2004: 80-85.
  • 9SON Y J, WYSK R A. Automatic simulation model generation for simulation-based, real-time shop floor control[J]. Computers in Industry, 2001, 45(3): 291-308.
  • 10GERTOSIO C, MEBARKI N, DUSSAUCHOY A. Modeling and simulation of control framework on a flexible manufacturing system[J]. International Journal of Production Economics, 2000, 64(1-3): 285-293.

二级参考文献26

  • 1刘检华,姚珺,宁汝新.虚拟装配工艺规划实现技术研究[J].机械工程学报,2004,40(6):138-143. 被引量:27
  • 2梁福军,宁汝新.可重构制造系统中基于相似性理论的虚拟制造单元生成方法[J].计算机集成制造系统,2004,10(11):1370-1376. 被引量:20
  • 3王国新,宁汝新,王爱民,唐承统,武志军.基于仿真的调度规则组合决策研究[J].北京理工大学学报,2006,26(7):598-601. 被引量:11
  • 4Mehrabi M G, Ulsoy A G, Koren Y. Reconfigurable manufacturing systems: Key to future manufacturing [J]. Journal of Intelligent Manufacturing, 2000, ( 11 ): 403 -419.
  • 5Wang Q, Chatwin C R. Modelling and Simulation of integrated Operations and Information Systems in Manufacturing [ J ]. Int. J Adv Manuf Technol,2002, (2): 142 - 150.
  • 6Jeong Ki-Young. Conceptual frame for development of optimized simulation-based scheduling systems[J].Expert Systems with Applications, 2000, 18 (1) : 299-306.
  • 7Butler Keith A, Bahrami Ali, Esposito Chris, et al.Conceptual models for coordinating the design of user work with the design of information systems[J]. Data &Knowledge Engineering, 2000, 33(2): 191-198.
  • 8Mo John P T, Menzel Christopher. An integrated process model driven knowledge based system for remote customer support [J]. Computers in Industry,1998, 37(2): 171-183.
  • 9The Boeing-Sikorsky RAh-66 Comanche Stealth Helicopter Information on the RAH-66 Stealth Comanche helicopter and the stealth technology used in it[OL].http://www.abovetop secret.com/pages/comanche.html[2005-01-12].
  • 10NONG Y,PRASHANT B,AMARNATH B.A comparative study of assembly planning in traditional and virtual environments[J].IEEE Transactions on Systems,Man and Cybernetics,Part C:Applications and Reviews,1999,29(4):546-555.

共引文献78

同被引文献64

引证文献9

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部