期刊文献+

混合粒子群算法在模糊柔性车间作业计划中的应用 被引量:2

Hybrid particle swarm optimization for fuzzy flexible job-shop scheduling problem
在线阅读 下载PDF
导出
摘要 针对现实生产系统中存在的时间参数模糊化问题,给出了一种基于区间值梯形模糊数的模糊柔性车间作业计划问题模型。在对模糊柔性车间作业计划问题进行有效求解方面,针对基本粒子群算法容易陷入局部最优的问题,随后给出了一种基于遗传操作的混合粒子群算法,利用遗传算法思想对粒子进行交叉、变异操作,增强了算法跳出局部最优的能力。仿真实验表明,该算法具有可行性和有效性。 To solve the problems correlated with fuzzy temporal parameter in real manufacture system,this paper introduced a fuzzy flexible job-shop scheduling( FJSS) model based on interval-valued trapezoidal fuzzy number firstly. After that,aiming at the problems of easily getting into the local optimum of basic particle swarm optimization ( PSO) algorithm,proposed a hybrid PSO algorithm based on crossover and mutation operations of genetic algorithm for the fuzzy FJSS problem above,which helped the algorithm to break away from the local optimum. At last,through the analysis of the simulating experiment results,approved the feasibility and efficency of the algorithm.
出处 《计算机应用研究》 CSCD 北大核心 2010年第10期3721-3723,共3页 Application Research of Computers
基金 江苏省教育厅高校哲学社会科学基金资助项目(09SJD630036) 南京工程学院校级科研基金资助项目(QKJA2009015)
关键词 柔性车间作业计划问题 模糊环境 粒子群算法 遗传算法 flexible job-shop scheduling problem fuzzy environment particle swarm optimization genetic algorithm
  • 相关文献

参考文献10

  • 1KACEM I. Genetic algorithm for the flexible job-shop scheduling problem [ C ]//Proc of IEEE International Conference. 2003 : 3464-3469.
  • 2贾兆红,陈华平,唐俊,卢冰原.面向多目标的自适应动态概率粒子群优化算法[J].系统仿真学报,2008,20(18):4959-4963. 被引量:11
  • 3LIN F T. Constructing a job-shop scheduling model based on imprecise data[ C]//Proc of the IEEE International Conference on Fuzzy System. 2003:1225-1233.
  • 4STANFIELD P M, KING R E JOINES J A. Scheduling arrivals to a production system in a fuzzy environment[ J ]. European Journal of Operational Research, 1996,93( 1 ) :75-87.
  • 5YAO Jing-shing,LIN F T. Constructing a fuzzy flow-shop sequencing model based on statistical data[ J]. International Journal of Approximate Reasoning,2002,29(3) :215-234.
  • 6EBERHART R C,SHI Y. Partical swarm optimization:developments, applications and resources [ C ]//Proc of Congress on Evolutionary Computation. 2001:81-86.
  • 7BERGH F. An analysis of particle swarm optimizers[ D]. South Africa:Department of Computer Science University of Pretoria,2002.
  • 8颜亮,姚锡凡,胡俊,吴昌生.用于车间作业调度的粒子群优化算法[J].制造技术与机床,2009(6):115-119. 被引量:4
  • 9卢冰原,陈华平,谷峰,古春生.基于区间值模糊集的柔性工作车间调度模型[J].计算机工程与应用,2006,42(5):56-58. 被引量:1
  • 10谷峰,陈华平,卢冰原.病毒遗传算法在柔性工作车间调度中的应用[J].系统工程与电子技术,2005,27(11):1953-1956. 被引量:13

二级参考文献34

  • 1乔兵,孙志峻,朱剑英.SOLVING FLEXIBLE JOB SHOP SCHEDULING PROBLEM BY GENETIC ALGORITHM[J].Transactions of Nanjing University of Aeronautics and Astronautics,2001,18(1):108-112. 被引量:13
  • 2陈华平,谷峰,古春生,卢冰原.两级排序遗传算法在柔性工作车间调度中的应用[J].系统仿真学报,2006,18(6):1717-1720. 被引量:12
  • 3陈华平,谷峰,卢冰原,古春生.自适应多目标遗传算法在柔性工作车间调度中的应用[J].系统仿真学报,2006,18(8):2271-2274. 被引量:25
  • 4Mai Gehrke,Carol Walker,Elbert Walker.Some Basic Theory of Interval-valued Fuzzy Sets[J].IEEE,2001.
  • 5Stefan Chanas On the interval approximation of a fuzzy number[J]. Fuzzy Sets and System,2001 ; 122 : 353-356.
  • 6Jing-Shing Yao,Jin-shieh Su.Fuzzy inventory with backorder for fuzzy tatal demand based on interval-valued fuzzy set[J].European Journal of Operational Research, 2000; 124 : 390-408.
  • 7Jing-Shing Yao,Feng-Tse Lin.Constructing a fuzzy flow-shop sequencing model based on statistical data[J].International Journal of Approximate Reasoning, 2002 ; 29:215-234.
  • 8Jin Peng,Kaoping Song.Fuzzy Flow-shop Scheduling Models Based on Credibility Measure[J],IEEE,2003.
  • 9Haoxun Chen, Jurgen Ihlow, Carsten Lehmann.A Genetic Algorithm for Flexible job shop scheduling[C].In:intemational conference on robitics &Automation, 1999.
  • 10Imed Cacem,Slim Hammadi.Approach by Localization and Multiobjective Evolutionary Optimization for Flexible Job-shop Scheduling Problems[J].IEEE, 2002.

共引文献25

同被引文献14

引证文献2

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部