摘要
介绍了济三选煤厂洗煤生产及煤泥水处理工艺以及粗煤泥处理系统存在的问题,分析了粗煤泥处理系统存在问题的原因,阐述了采取安装高频筛后取得的效果和意义。
Introduce the situation of coal washing production, the technology of slime water treatment and the problem existed in slime water treatment system. Provide some measures to solve the problem, expound the effect and importance after installing the high-frequency screen.
出处
《洁净煤技术》
CAS
2010年第5期37-38,22,共3页
Clean Coal Technology
关键词
粗煤泥处理
FC离心机
末煤回收
slime water treatment system
FC centrifugal
stack coal recovery