期刊文献+

汶川8.0级地震中长期预测及跟踪短期预测探讨

Mid-long Term Forecast and Short Term Targeting Prediction Method for the 2008 Wenchuan M_S8.0 Earthquake in China
在线阅读 下载PDF
导出
摘要 1999年,笔者发表了对2008年中国汶川8级地震的中长期预测结果,预测的最危险地区为汶川,上限震级为7.2级(实际震级8.0,误差0.8级),危险时段为2007—2012年、2021年以后(实际地震发生在第一危险时段内)。本文对预测方法做了概要介绍,总结了方法的特点,提出了改进意见,并探讨了跟踪短期预测方法。 In 1999,the author published results of mid-long term forecast for the 2008 Wenchuan MS8.0 earthquake.The forecasted riskest area were Wenchuan county,with the upper limit magnitude of 7.2,and the risk periods of time had benn estimated to be 2007—2012 and beyond 2021.This paper expounds synopsis and characteristiucs of mi-long term forecast method by using the superpositive field of residual and present stresses,advances improving on the forecast,and explores a short term forecast method following the tracks of mid-long term forecast for the 2008 Wenchuan MS8.0 earthquake.
作者 安欧
出处 《地震》 CSCD 北大核心 2010年第4期89-97,共9页 Earthquake
基金 中国地震局老专家科研基金资助项目(201041) 地震科学联合基金资助
关键词 汶川8.0级地震 中长期预测 短期预测 Wenchuan MS8.0 earthquake Mid-long term forecast Short term forecast method
  • 相关文献

参考文献8

二级参考文献8

共引文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部