期刊文献+

对我国特高压输电系统过电压和绝缘配合的建议 被引量:37

Overvoltage and Insulation Coordination on Ultra High Voltage Power Transmission System in China
在线阅读 下载PDF
导出
摘要 参考国内外研究成果,分析我国下一世纪初可能要建设的特高压输电系统限制过电压、潜供电流的主要方法和限制后过电压、潜供电流的水平并选择了MOA 的参数。在此基础上,对特高压系统的主要变电设备(包括变压器、断路器、隔离开关、电抗器和MOA)和输电线路的绝缘水平提出了建议。 Refer to the domestic and foreign research results, this paper presents the major methods of suppressing over voltage and second arc current in UHV power transmission system which will be build next ceutary in China. It also gives the over voltage level and the second arc current level after using the suppressing methods and the parameters of MOA. This paper, based on above analysis and research, suggests the insulation level of the main equipment in UHV system (including transformer, circuit breaker, disconnecting switch, reactor and MOA), which can be used as a references to research, manufacture of UHV equipment and design of power substation and transmission line.
作者 谷定燮
出处 《高电压技术》 EI CAS CSCD 北大核心 1999年第1期29-32,共4页 High Voltage Engineering
关键词 特高压输电系统 过电压 绝缘配合 UHV overvoltage insulation coordiration
  • 相关文献

参考文献5

  • 1谷定燮,陆宠惠.日本特高压系统过电压和绝缘配合[J].中国电力,1998,31(11):67-69. 被引量:20
  • 2赴日考察特高压的资料,1997年
  • 3我国特/超高压输电技术发展学术研讨会论文集,1995年
  • 4特高压技术前期及基础研究报告,1987年
  • 5亚历山大罗夫ΓΗ,超高压送电线路的设计,1987年

共引文献19

同被引文献279

引证文献37

二级引证文献430