承钢综合废水处理厂一期工程设计 被引量:3

Design of First-stage Project of Integrated Wastewater Treatment Plant in Chengde Iron and Steel Company
原文传递
导出
摘要 以承钢公司全厂综合废水处理厂一期工程为例,介绍了典型的冶金厂综合废水的处理工艺:格栅/调节池/高密度沉淀池/V型滤池,并对此工艺运行两年多来出现的问题提出解决办法。 Using the first-stage project of integrated wastewater treatment plant in Chengde Iron and Steel Company as an example, the typical combined process of bar screen, buffer tank, Densadeg clarifier and V filter for treatment of integrated wastewater from metallurgical plant is introduced. The so- lutions for problems in operation of the combined process for more than two years are put forward.
出处 《中国给水排水》 CAS CSCD 北大核心 2010年第18期88-91,共4页 China Water & Wastewater
关键词 高密度沉淀池 V型滤池 冶金厂综合废水 设计 Densadeg clarifier V filter integrated wastewater from metallurgical plant design