摘要
本文对用传统方法观测尾矿坝浸润线进行分析,并在用轻型井点降低尾矿坝浸润线的试验中,设计出三层测压系统。
Observation of the wetting line of tailing dam by traditional method is analyzed. In the test of lowering the wetting line of tailing dam by light well point observation ssytem of three-layer piezometers structure has been designed.
出处
《工程勘察》
CSCD
北大核心
1989年第3期45-48,共4页
Geotechnical Investigation & Surveying