期刊文献+

自升式钻井平台穿刺分析 被引量:18

Investigation of the Punch-through in Jack-up Rigs
原文传递
导出
摘要 自升式钻井平台是近海石油和边际油田开发的重要设备。据统计,穿刺事故占自升式钻井平台总事故的比例超过了50%,造成平台严重损坏和人员伤亡。以Arab drill 19自升式钻井平台和中国某自升式钻井平台的穿刺事故为例,分析穿刺事故发生的原因,说明穿刺事故的危害。采用投影面积法,分析了中国某自升式钻井平台在渤海某井位发生穿刺事故的可能性,结果表明,该平台存在较大的穿刺风险,并预测了穿刺后的插桩深度。对比平台实际插桩深度,预测结果存在较大误差。结合穿刺研究的最新成果,分析两者存在误差的原因:实际插桩过程中,桩靴底部将形成砂土塞,该砂土塞会极大地提高土体的极限承载能力,导致实际插桩深度比预测插桩深度浅。 Jack-up rigs are widely used in offshore oil and marginal oil field development.According to statistics,punch-through accidents account for more than 50% of jack-up rigs' accidents,leading often to serious damages of the jack-up rigs and casualties.Taking the Arab drill 19 jack-up and a Chinese jack-up as examples,the causes of the accidents and the seriousness of consequences are analyzed.The projected area method is used to study the possibility of punch-through for a domestic jack-up at a well site in Bohai Bay.It is found that the punch-through risk at the well site is high.The calculated penetration depth does not agree very well with the actual operational record,with a great error,which is analyzed in this paper based on new research results of punch-through.It is shown that during punch-through in a jack-up rig,a sand plug will be formed under the spudcan of the jack-up rig,which increases the ultimate bearing capacity of soil,and reduces the actual depth.
出处 《科技导报》 CAS CSCD 北大核心 2010年第17期63-66,共4页 Science & Technology Review
关键词 自升式钻井平台 穿刺 投影面积法 砂土塞 jack-up rig punch-through projected area method sand plug
  • 相关文献

参考文献17

  • 1Riglogix. Rig report: Offshore rig fleet by rig type [RB/OL]. http://www. rigzone.eom/data/rig_report.asp ?rpt =type.
  • 2Health & Safety Executive. Guidelines for jack-up figs with particular reference to foundation integrity [R/OL]. 2004, http://www.hse.gov.uk/ research/rrpdf/rr289.pdf.
  • 3Ueda Y, Rashed S M H, Ishihama T, et al. Ultimate strength of jack-up rigs in survival and punch-through conditions [J]. Transactions of JWRI, 1987, 16(2): 393-403.
  • 4Fujii T, Kobayashi T, Tagaya K. Punch-through Encountered in India and Indonesia [C]//Offshore Technology Conference. Houston: Offshore Technology Conference, 1989: 6124-MS.
  • 5Watanabe Y. Development and field tests on prototype of leg penetration monitor system to avoid the punch-through accidents of jackup rigs[C]// Offshore Technology Conference. Houston: Offshore Technology Conference, 1990: 6469-MS.
  • 6Rapoport V, Devoy S D, Alford J, et al. Soil-structure interaction during preloading of jackup MODU's in different soil conditions [C]//Offshore Technology Conference. Houston: Offshore Technology Conference, 1994: 7531-MS.
  • 7Maung U M, Ahmad C K M. Swiss cheesing to bring in a jack-up rig at anding location [C]//IADC/SPE Asia Pacific Drilling Technology, Kuala Lumpur, 2000: 62755-MS.
  • 8Osborne J J, Paisley M. S E Asia jack-up punch-throughs: The way forward [C]//Offshore Site Investigation and Geotechnics Diversity and Sustainability, Proceedings of an International Conference. London: The Society for Underwater Technology. 2002: OSIG-02-301.
  • 9Baglioni V P, Chow G S, Endley N C. Jack-up rig foundation stability in stratified soil profiles [C]//Offshore Technology Conference. Houston: Offshore Technology Conference, 1982: 4409-MS.
  • 10Hossain M S, Cassidy M J, Daley D, et al. Experimental investigation of perforation drilling in stiff-over-soft clay [J]. Applied Ocean Research, 2010, 32(1): 113-123.

同被引文献115

引证文献18

二级引证文献63

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部