摘要
详细介绍了晋中电网2009年的电压和无功补偿的现状,探讨了有载调压变、电容器等有关问题。最后根据对电压和无功的技术要求,以及无功补偿设备存在的问题,提出了相应的改进建议。
The status of the voltage and reactive power compensation of Jinzhong Grid in 2009 is introduced in detail and the related issues such as transformer with on-load tap changer and capacitor are discussed.The corresponding suggestions for improvement are proposed according to the technical requirements to the voltage and reactive power and the problems with reactive power compensation equipment.
出处
《电力电容器与无功补偿》
2010年第4期19-21,25,共4页
Power Capacitor & Reactive Power Compensation
关键词
晋中电网
电压质量
无功补偿
无功补偿设备
Jinzhong Grid
voltage quality
reactive power compensation
reactive compensation equipment