转换梁因钢筋密集、混凝土量大、模板及支撑体系要求高,造成施工难度大。合理的采取施工措施,对保证结构转换层的质量及整个主体质量有着极其重要的作用。介绍了转换梁规范要求及施工难点,通过工程实例阐述了转换梁的施工措施。
Because of intensive steel, large concrete and a high demand for formwork and supportive system, construction is very difficult. Reasonable measures should be taken which has an extremely important role in ensuring the quality of transfer story structure and the main body. This paper introduces the requirements and construction difficulty of the transfer beam and explains construction measures of the transfer beam by engineering examples.