摘要
结合工程实例,介绍了隧道下穿公路的施工方案,具体对超前大管棚施工和短台阶开挖施工作了论述,并对其监控量测、质量及安全保证措施进行了归纳,最后总结了几点体会,以期指导实践。
Combining with the engineerig cases, this paper introduces the construction plan of the tunnel passing through the highway and has a special discussion on the leading steel pipeline shed construction and short steps excacating construcion. It has an induction on monitoring measurement, quality and safety assurance steps. At last, summarizing the experience to guide the practice.
出处
《山西建筑》
2010年第24期341-343,共3页
Shanxi Architecture
关键词
隧道
下穿公路
施工
超前大管棚施工
短台阶施工
tunnel, passing through highway, construction, the leading steel pipeline shed construcion, short steps construction