摘要
合理的测试设计可以用最短的施工时间完成资料录取工作,在施工安全、减少排放、保护工具、提高工程效率等方面起到良好效果。本文通过对试气工程过程的分析及多年现场经验的总结,提出试气前对地层的地质分析,试气过程对设计的及时调整达到使试气设计更符合地层实际情况,由此得出合理的工程安排,提高工作效率和准确性。
Setting an appropriate testing plan can guarantee the completion of data recording in shortest time and also can wield good impact on construction safety, emission reduction, preparation of facilities for protection and efficiency improvement. Through analyzing the gas testing process and years of experiences in field practice, this essay had suggested that the pre-testing geological analysis of stratum and timely adjustment of plan during testing could result in better accordance with the practical conditions of stratum so as to come up with reasonable project arrangement, better work efficiency and accuracy.
出处
《江汉石油职工大学学报》
2010年第4期14-17,共4页
Journal of Jianghan Petroleum University of Staff and Workers
关键词
气井试气
地质设计
现场调整
Gas Testing of Gas Well Geological Design
on Site Adjustment