地铁围护结构桩顶水平位移监测的精度分析 被引量:2

Accuracy Analysis of Horizontal Displacement Monitoring of Pile Cap in Subway Surrounding Protection Structure
在线阅读 下载PDF
导出
摘要 主要描述了西安地铁二号线车站基坑围护结构桩顶水平位移监测的技术方案,结合基准线法和测小角法测定水平位移,并对实际角度观测进行了误差分析,探讨了地铁围护结构桩顶水平位移监测的观测点坐标对中误差,推导出了采用不同精度的测角仪器观测水平角所需的测回数。 The technical solutions of horizontal displacement monitoring of pile cap in subway surrounding protection structure in Xi'an is introduced.Combined with the horizontal displacement monitored by small angel measuring method with baseline method and the error analysis of angle observation,the coordinate's RMS error of observed points of horizontal displacement monitoring of pile cap is discussed. Then,the measurement times by kinds of different precision angle measuring instruments is deduced.
作者 齐振江
出处 《土工基础》 2010年第3期46-48,共3页 Soil Engineering and Foundation
关键词 围护结构桩顶 水平位移 精度分析 pile cap of surrounding protection structure horizontal displacement accuracy analysis
  • 相关文献

参考文献4

二级参考文献1

共引文献11

同被引文献12

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部