期刊文献+

上海芙蓉江混流排水系统排江污染及控制对策 被引量:1

Control Measures of Pollutants Discharge from Furongjiang Disordered Drainage System
原文传递
导出
摘要 基于我国排水体制现存特有问题,首次明确了混流排水系统的概念。针对典型混流排水系统——芙蓉江排水系统,对其排江水质污染过程进行研究。结果表明,排江水质污染负荷高、排江水体污染总负荷大,同时在一定降雨条件下存在较明显的排江污染初期效应。在分析导致排江水质较差因素的基础上,对雨水调蓄的污染控制对策进行了分析,得到调蓄池削减污染负荷率最高的调蓄池启动时间点。 Based on the special problems existing in drainage system in China, a new drainage system called disordered drainage system (DDS) was defined. In the light of the representative DDS, namely the Furongjiang drainage system, the pollutants discharge characteristics were studied. The results indicate that the pollution load of water discharged into the river is high, and the total pollution load is high. Under a given rainfall, there is a remarkable first flush effect. Based on the analysis of poor quality of water discharged into the river, control measures of pollutants discharge by storm detention tank are proposed, and the optimal start time of the detention tank is obtained.
出处 《中国给水排水》 CAS CSCD 北大核心 2010年第14期7-10,15,共5页 China Water & Wastewater
基金 国家水体污染控制与治理科技重大专项(2008ZX07317-001) 上海市科学技术委员会重点科技项目(072312002)
关键词 混流排水系统 排江水质 初期效应 调蓄池 最佳启动时间 disordered drainage system (DDS) quality of water discharged into river firstflush effect detention tank optimal start time
  • 相关文献

参考文献7

二级参考文献16

  • 1李田,郑瑞东,朱军.排水管道检测技术的发展现状[J].中国给水排水,2006,22(12):11-13. 被引量:65
  • 2李田,周永潮,李贺,朱民强,王如春.基于流量调查的分流制雨水系统诊断研究[J].中国给水排水,2007,23(7):1-5. 被引量:8
  • 3朱民强,王如春.排水管网维护中的高新技术应用[J].城市道桥与防洪,2007(5):51-56. 被引量:10
  • 4Bertrand-Krajewski Jean-Luc, Chebbo Ghassan,Saget Agnes. Distribution of pollutant mass vs. volume in stormwater discharges and the first flush phenomenon[J]. Wat Res, 1998,32 (8) :2341-2356.
  • 5Lee Jun Ho, Bang Ki Woong. Characterization of urban stormwater runoff[J]. Wat Res, 2000,34 (6): 1773-1780.
  • 6Larsen Torben. First flush effects in an urban catchment area in aalborg[J]. Wat Sci Tech, 1998,37 (1): 251-257.
  • 7Saget Agnes, Chebbo Ghassan, Bertrand-Krajewski JeanLuc. The first flush in sewer systems [J]. Wat Sci Tech,1996,33(9) :101-108.
  • 8Gupta K, Saul A J. Specific relationships for the first flush load in combined sewer flows [J]. Wat Res, 1996,30(5) :1244-1252.
  • 9Stahre, Urbonas. Stormwater Detention [M]. Englewood Cli. s: Prentice Hall, Inc. , 1990.
  • 10Wanielista, Yousef. Stormwater Management [M]. New York :John Wiley and Sons, Inc. , 1993.

共引文献49

同被引文献6

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部