急倾斜巷道贯通测量技术要素分析 被引量:1

The Analysis of Transfixion Survey Technical Factor in Steep Tunnel
在线阅读 下载PDF
导出
摘要 胶带机头联络斜巷主要承担顾桥矿井-665m水平至-780m水平的联络运输任务。斜长245m,倾角为29°,分上、下两段相向施工。由于顾桥矿井地质条件复杂,工程质量要求高,采用了严密误差预计,操作得当,措施合理,测角、高程测量准确,线量误差为52.4mm,保证了胶带机头联络斜巷的贯通精度。 The contacts steep tunnel of belt loader installation is mainly undertakes transport from-665m to -780m levels.inclined length 245m,angle 29°.the survey is divided into two sections(the upper section and the lower section),owing to complicated geological condition in Guqiao mine,rigor error calculation in advance is adopted.Thanks to proper operation,reasonable measures, as well as accurate angle and height measuring,linear error is only 52,4mm,ensuring the holding through accuracy. Key Words:steep,transfixion survey, error predication
作者 王经福
出处 《科技资讯》 2010年第20期31-31,33,共2页 Science & Technology Information
关键词 急倾斜 贯通测量 误差预计 steep transfixion survey error predication
  • 相关文献

参考文献3

  • 1周立吾 张国良 林家聪.矿山测量学[M].徐州:中国矿业学院出版社,1986..
  • 2李栖凤.急倾斜煤层开采[M].煤炭工业出版社,1984.
  • 3中国统配煤矿总公司.煤矿测量规程[M].北京:煤炭工业出版社,1990..

共引文献10

同被引文献10

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部