拉西瓦水电站机组一次调频性能优化 被引量:2

Optimization of Primary Frequency Modulation Performance in Generator Units of Laxiwa Hydropower Station
原文传递
导出
摘要 针对拉西瓦水电站机组和调速系统特点,同时考虑水电机组一次调频过程功率反调的情况,对机组一次调频参数进行了优化,对存在的一次调频与监控系统自动发电控制(AGC)(二次调频)不匹配问题进行了优化改进,确保一次调频与监控系统AGC两者均能正常发挥作用。 According to the characteristics of the units and regulating system of the Laxiwa Hydropower Station,and in consideration of the power counter-adjustment in hydro-units primary frequency modulation process,the primary frequency modulation parameters are optimized according to the primary frequency modulation technology requirements of electric power dispatching institution. The poor matching between primary frequency modulation and AGC (secondary frequency modulation) is improved and optimized; thus,both primary frequency modulation and AGC can play their normal functions.
出处 《水电自动化与大坝监测》 2010年第3期11-13,共3页 HYDROPOWER AUTOMATION AND DAM MONITORING
关键词 水电站 水轮发电机组 一次调频 AGC 优化 hydropower station water turbine-generator set primary frequency modulation automatic generation control (AGC) optimization
  • 相关文献

参考文献6

二级参考文献18

共引文献63

同被引文献12

引证文献2

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部