介绍了600MW超临界机组给水泵汽轮机通过系统、设备改进后实现油泵正常连锁情况。通过方案和试验的对比分析,经过比较论证选定最终方案,对系统进行了设计改进、增加配件。试验及现场长期运行表明,设计改进是成功的,该方案的实际效果完全满足油泵正常连锁要求。
It is presented that the normal linkage is realized by improving the system and equipment for BFPT in 600MW supercritical units.Through the analysis of scheme and test contrast,the design is updated and fittings are added.The test and long-term operation indicate that the advanced design is successful,so the scheme/'s actual effect can entirely satisfy the requirements for normal linkage of the oil pump.