摘要
以某工程实例为背景,介绍了后张法预应力混凝土现浇箱梁施工方法和工艺要点,通过对箱梁各分部工序的严格管理和实时监控,后张法预应力箱梁的施工质量达到了预期的效果。
Taking an engineering as a background,this thesis introduces the construction method and process elements cast post-tensioned concrete box girder.Through strict management and real-time monitoring in the processes of every part of the box girder,it finds that post-tensioned box girder construction quality achieves the desired results.
出处
《山西建筑》
2010年第17期306-307,共2页
Shanxi Architecture
关键词
预应力
箱梁
施工
模板
prestress
box girder
construction
template