针对新开河工程地处市区,工期要求短,环保要求高,不影响周边建筑物的安全及最大限度减少对居民生活的影响,选择适合本场地地质特点的边坡支护方案进行了比选,以期尽可能降低工程造价,确保工程进度。
Aiming at Xinkai river engineering located in city,the engineering time should be short,the environmental requirement should be high,it should not influence surround building safety and reduce influences on residential district at maximum limit,the side slope supporting program adopted to field geological characteristics were chose alternatively,so as to reduce engineering cost possible and guarantee engineering progress.
出处
《山西建筑》
2010年第17期132-133,共2页
Shanxi Architecture
关键词
边坡支护
方案比选
施工工期
工程造价
side slope support
program alternative choice
construction time
engineering cost