摘要
主要从小试装置的启动运行。
This article deals with the startup and running of the laboratory-scale unit, enhancing treating load other relative problems on biofilm poocess of prlyether waetewater treatment.
出处
《石油化工环境保护》
1999年第1期11-15,共5页
Environment Protection in Petrochemical Industry